Pecue Lane/I-10 Interchange

Critical Infrastrucure project

Project Location

Baton Rouge, LA

Project Duration

7 years

Construction Cost

$40,000,000

Project Overview

LA 19 bridge crossing as part of the Comite River Diversion Channel Project, a major flood-risk reduction initiative designed to divert floodwaters from the Comite River to the Mississippi River. The project involves construction of a new highway bridge over the future diversion channel, roadway realignment, and extensive coordination to maintain traffic flow during construction.

Project Challenges

Construct a New LA 19 Bridge

over the Comite River Diversion Channel on the existing highway alignment.

Maintain Traffic Operations

through construction of temporary staging and a railroad shoofly bypass.

Support Flood Control Infrastructure Development

by enabling excavation and completion of the diversion channel beneath the crossing.

Manage Utility Conditions

using ground improvement and extensive utility coordination.